1887

Abstract

H-12 OPTIMISING WITHDRAWAL AND INJECTION PERFORMANCE FOR GAS STORAGE RESERVOIRS Abstract 1 The paper will present an integrated approach defined and implemented by ENI AGIP technical services and STOGIT SpA (the Italian gas storage company) for the optimisation and day-by-day operation of gas storage reservoirs. In the scope of the project reservoir simulation models and plant simulation models have been integrated to provide the complete picture for the selection of optimal operating points. Models are continuously and automatically updated with gas withdrawal/injection data and plant component availability and efficiency status. Optimisation techniques have been exploited to determine the best scheduling

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.5.H012
2002-05-27
2024-04-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.5.H012
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error