1887
PDF

Abstract

Within the context of a study carried out jointly by the IFP, CGG, Gaz de France and Elf Aquitaine, three permanent three-component seismic sensors were installed at depths of 783, 815 and 905 m in a borehole situated on the flank of a G.D.F. gas storage site. The reservoir is located at a depth between 815 and 905 m.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201411650
1993-06-08
2024-04-23
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201411650
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error