Home

Quick Links

Search

 
3D/4D realistic monitoring considerations - is it possible ?Gold Open Access

Authors: A. Price and D. Watts
Event name: 71st EAGE Conference and Exhibition - Workshops and Fieldtrips
Session: WS 2: Marine CSEM – Where Do We Stand and Where Do We Go?
Publication date: 08 June 2009
DOI: 10.3997/2214-4609.201404890
Organisations: SPE, EAGE
Language: English
Info: Abstract, PDF ( 298.45Kb )

Summary:
Total with the assistance of WesternGecoEM acquired a rich 3D marine Controlled Source Electromagnetic (CSEM) dataset offshore West Africa toward the end of 2006 (Figure 1.). This dataset was intended to be a definitive validation of the technique or proof of concept over a well understood target for which definitive measures could be made of many different types of analysis and inversion. The dataset was also acquired at the beginning of the fields’ life so that the opportunity remained for monitoring the production development electrically.

Download
Back to the article list