1887

Abstract

Many oil fields in Oman are developed with horizontal wells<br>to maximize productivity and develop wider drainage areas for<br>more cost effective recovery. Premature water breakthrough<br>either from water injectors or from water aquifer reduces the<br>wells profitability because of both reduction in net oil rate and<br>additional cost for water handling. To determine the best<br>solution to shut-off, source and nature of the water entries<br>must be well identified.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.148.iptc11958
2008-12-03
2024-03-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.148.iptc11958
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error