1887

Abstract

At present, hundreds of horizontal wells have been drilled in Hassi Messaoud counting for about one fourth of the field’s<br>output. Among these, several wells are underperforming and could not yield the expected production. Vertical and areal<br>permeability anisotropies, absence of natural fractures, severe heterogeneity, reservoir damage and wellbore instability are<br>the main factors to blame for poor productivity. To address the problem of poor vertical communication and get past the near<br>wellbore damage, hydraulic fracturing has been thought of as the best solution to improve productivity.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13021
2009-12-07
2024-04-18
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13021
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error