1887
PDF

Abstract

Drilling galleries with tunnelers is subjected to strict technical requirements. The anticipation of<br>obstacles in advance of the tunnelling is essential to the operations and the in-site day-by-day safety.<br>The recognition of the fractured zones and the circulation of water are the objectives of this<br>methodology combining high-resolution seismic and 3D tomography.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.154.P002_EricGillot
2005-09-14
2024-04-20
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.154.P002_EricGillot
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error