An infrared survey was carried out on a concrete bridge deck using a mobile IR-acquisition unit. The survey covered one lane of the bridge and was repeated once per hour during 20 hours. Results show only minor temperature differences between on bridge and off bridge and no influence of structural elements such as girders.