Long-term Geoelectrical Monitoring to Support Nuclear Decommissioning at the Sellafield Site, UK
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, Near Surface Geoscience 2014 - 20th European Meeting of Environmental and Engineering Geophysics, Sep 2014, Volume 2014, p.1 - 5
Abstract
Summary
The reduction of risk and hazard associated with the UK’s civil nuclear legacy is a strategic priority for the UK’s Nuclear Decommissioning Authority (NDA). A full-scale field trial using 4D ERT has been completed successfully at the Magnox Swarf Storage Silos at the Sellafield Site, which has monitored a controlled injection experiment. This paper summarises the achievements of the trial and lays out future plans for geoelectrical monitoring at Sellafield. The potential of ERT as a long-term monitoring tool is explored, and electrode longevity estimates are made based on the results of the MSSS trial.