1887
PDF

Abstract

Summary

The main oil production object design U1-2 of field Kraynee drilled on various development systems. This geological object is currently under active development for the period 2012–2015 drilled 126 wells. Due to the small oil-saturated thickness and low permeability reservoir of the object from the drilling of directional wells has moved to drilling horizontal wells with multi-stage fracturing conduct in the development and direction of different horizontal sections. Analysis of the efficiency of reserves recovery on units with different systems of development have shown that a clear advantage of any system the location of wells for the Jurassic sediments have not been identified.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201602307
2016-10-04
2024-03-28
Loading full text...

Full text loading...

/deliver/fulltext/2214-4609/2016/G04.html?itemId=/content/papers/10.3997/2214-4609.201602307&mimeType=html&fmt=ahah

References

  1. «Пересчет геологических запасов нефти, растворенного газа и сопутствующих компонентов Крайнего нефтяного месторождения» по состоянию на 01.01.2009 г., (протокол ГКЗ Роснедра № 2127-дсп от 17.02.2010 г), ОАО «ЦГЭ», Москва, 2010.
    [Google Scholar]
  2. «Дополнение к Технологической схеме разработки Крайнего нефтяного месторождения», утверждено ЦКР Роснедра по УВС № 6160 от 25.12.2014 г., ООО «Газпромнефть НТЦ», Санкт-Петбург-Тюмень, 2014.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201602307
Loading
/content/papers/10.3997/2214-4609.201602307
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error