Home

Quick Links

Search

 
Executing the Repeat Contract - a Case Study from BrazilNormal access

Authors: P. Sack and F. Gonzalez
Event name: First EAGE Workshop on Practical Reservoir Monitoring
Session: Cost-Effective 4D Operations
Publication date: 06 March 2017
DOI: 10.3997/2214-4609.201700005
Organisations: EAGE
Language: English
Info: Extended abstract, PDF ( 626.53Kb )
Price: € 20

Summary:
PRM and 4D surveys utilizing bottom equipment present a unique contracting challenge to the operator due to the very different installation and acquisition phases. The services of such a survey can be considered a commodity as opposed to the sensor equipment, and the equipment’s installation, which may hold a technological value. Therefore the services portion can be separated to attract market rates. To fully realize the gains and improvements of the repeat surveys, the collective survey timeline should be considered to check that the process is accommodated both during and between the interval surveys.


Back to the article list