Full text loading...
-
Verification of Pumping Schedules in Order to Prevent Complications During Hydraulic Fracturing
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, Saint Petersburg 2018, Apr 2018, Volume 2018, p.1 - 5
Abstract
Summary
The paper presents a method for controlling the quality of pumping schedules. Schedule is given by optimization in software products using Pseudo3D and Lumpen parameter models. It is proposed to test the injection stages in Planar3D simulator. The method allows to prevent and avoid such complications as water flooding. Using of the method will decrease risks during fracturing.
© EAGE Publications BV