1887

Abstract

Summary

The stable state of the rock massif is defined by its fracture structure, and a possibility of blocks’ displacement.

For risks reduction of downfall formation it is necessary to estimate jointing degree of the rock massif and influence of technogenic earthquake vibrations. Assessment is based on carrying out the following types of works:

Engineering-geological mapping of the rocky massif includes documentation of cracks on express platforms. Seismic researches by measurement method of earthquake vibrations from the passing trains and blasting.

On the basis of jointing documentation it is established that the rock massif is broken into blocks of different forms. In upper sections clumpy and columnar structures are predominant, in the bottom sections - flake stones.

The columnar structure is the most dangerous one.

While processing results of crack bedding elements the three main systems of cracks are allocated.

The registered speed rates of subsoil earthquake vibrations during trains passing and carrying out of blasting are much less than admissible speed rate and also do not break stability of the rock massif of a slope.

The analysis of the performed works results allowed to divide sites on 3 danger categories: approximately safe, dangerous and very dangerous.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201800545
2018-04-23
2024-04-19
Loading full text...

Full text loading...

References

  1. AbaturovaI.V. et al.
    [2017] Analysis of the degree of fracturing of the rock during engineering-geological surveys. 13th Conference and Exhibition Engineering Geophysics 2017. DOI: 10.3997/2214‑4609.201700374.
    https://doi.org/10.3997/2214-4609.201700374 [Google Scholar]
  2. AbaturovaI.V.
    i dr. [2011] Osobennosti ocenki stepeni treshchinovatosti porod pri inzhenerno-geologicheskom izuchenii mestorozhdenij poleznyh iskopaemyh. Inzhenernaya geologiya,1, 68–72.
    [Google Scholar]
  3. BondarenkoI.F.
    [2017] Burovzryvnye raboty na kimberlitovyh kar’erah YAkutii. IGD UrO RAN, Ekaterinburg, 172 s.
    [Google Scholar]
  4. ZharikovS.N.
    [2013] O vliyanii vzryvnyh rabot na ustojchivost’ bortov kar’erov. Izvestiya vysshih uchebnyh zavedenij. Gornyj zhurnal,2, 80–83.
    [Google Scholar]
  5. MihajlovA.E.
    [1956] Polevye metody izucheniya treshchin v gornyh porodah. Gosudarstvennoe nauchno-tekhnicheskoe izdatel’stvo literatury po geologii i ohrane nedr, Moscow, 132 s.
    [Google Scholar]
  6. PisetskiV.B. et al.
    [2017] Solving the problems of obtaining geological information with using geophysical methods of research during engineering-geological surveys. 23rd European Meeting of Environmental and Engineering Geophysics. DOI: 10.3997/2214‑4609.201701984.
    https://doi.org/10.3997/2214-4609.201701984 [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201800545
Loading
/content/papers/10.3997/2214-4609.201800545
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error