Full text loading...
-
The Results of a Comprehensive Study of the Sections of Parametric Wells Drilled in the West of the Siberian Platform
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, Geomodel 2018, Sep 2018, Volume 2018, p.1 - 5
Abstract
In the west of Siberian platform in the territory of Krasnoyarsk region in 2013–2014 years was drilled parametric wells Chunkinskaya 282 and Maygunskaya 275. In 2016 the testing of perspective facilities in the production column and during the period from 2015 to 2017 was completed a complex study of well sections was carried out. Chunkinskaya Parametric Well No. 282 was drilled on the northeastern slope of Baikit Anteclise, and Maigunskaya 275 on the northwestern slope of the same structure, the purpose of drilling the parametric wells was to study the geological structure of the northern slopes of Baikit anteclise and assess the prospects of the oil and gas bearing of the Riphean deposits, Vendian and Cambrian.
The report will consider the results of a comprehensive study of the cuts of parametric wells and draw conclusions about the prospects of oil and gas potential.