The Ketzin pilot site is the longest operating onshore CO2 storage site in Europe. CO2 injection began in June 2008 and ended in August 2013. In total five wells were drilled at the Ketzin pilot site. During the abandonment, well construction material samples were retrieved. The samples were retrieved from the cementitious plug as well as from the steel casing and the production string at different depths. The samples were analyzed by a set of complementary experimental techniques.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201802983
2018-11-21
2024-03-29
Loading full text...

Full text loading...

/deliver/fulltext/2214-4609/2018/Th_CO2_P02.html?itemId=/content/papers/10.3997/2214-4609.201802983&mimeType=html&fmt=ahah

References

  1. [1]GawelK, TodorovicJ, LiebscherA, WieseB and OpedalN. Study of Materials Retrieved from a Ketzin Monitoring Well. Energy Procedia Volume, 114, July, 2017 Pages 5799–5815
    [Google Scholar]
  2. [2]TodorovicJ, GawelK, OpedalN, LiebscherA, WieseB and MöllerF. Study of casings retrieved from the final abandonment of the Ketzin pilot site. To be presented at the GHGT-14 in Melbourne 2018.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201802983
Loading
/content/papers/10.3997/2214-4609.201802983
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error