1887

Abstract

Summary

In this paper, we discuss a Time-Lapse project over a deep-water field which started with a feasibility study, aimed at assessing the detectability of production effects at the time of the second survey which was not designed for monitoring purposes. It continued with an optimized processing workflow aimed at reducing the differences due to different acquisition surveys. Finally, an inversion study was done as well as interpretation of the time-lapse result and including a correlation with the reservoir model. This study allowed to efficiently and accurately estimate the fluid-flow movements in the field and thus to support the field management.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201900012
2019-04-01
2024-04-20
Loading full text...

Full text loading...

References

  1. Kragh, E. and Christie, P.
    [2002] Seismic repeatability, normalised RMS and predictability. The Leading Edge, 21(7), 640–647.
    [Google Scholar]
  2. Lumley, D. E., Behrens, R. A., and Wang, Z.
    , [1997] Assessing the technical risk of a 4-D seismic project: The Leading Edge, 16, 1287–1291
    [Google Scholar]
  3. Lecerf, D., Burren, J., Hodges, E., and Barros, C.
    [2015] Repeatability measure for broadband 4D seismic. SEG Technical Program Expanded Abstracts 2015: pp. 5483–5487.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201900012
Loading
/content/papers/10.3997/2214-4609.201900012
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error