1887

Abstract

Summary

Throughout the production life of the Balder & Ringhorne fields, 4D seismic has proven to be a valuable tool and been used extensively: In 2006, 2009 and 2012, monitor surveys were acquired to support the Ringhorne Phase II and Balder Phase III drilling campaigns in target maturation and optimization. In 2017, Vår Energi became operator of Balder and Ringhorne and initiated a major redevelopment plan to maximize the area potential by extensive infill drilling, the provision of additional processing capacity and field-life extension. In 2018, a new monitor survey was acquired to support this new development phase. Results from fast track processing show high repeatability and insightful early observations.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201900015
2019-04-01
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201900015
Loading
/content/papers/10.3997/2214-4609.201900015
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error