At the designing stage of Novoportovskoye field development, a decision was made to drill 1,000-1,500 m horizontal wells. In 2015-2016, the project team developed a technology plan that included an assessment of technological availability to drill complex design wells and selection of geological targets for testing and subsequent economic evaluation.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201901862
2019-05-27
2024-03-28
Loading full text...

Full text loading...

References

  1. Технологические вызовы при разработке нефтяных оторочек Новопортовского месторождения/БадгутдиновР.Р., АпасовР.Т., ФедоровМ.В., УшмаевО.С., СитниковА.Н., БаженовД.Ю., ГаренскихД.А.// Нефтяное хозяйство. – 2015. - №12. – С. 56–59.
    [Google Scholar]
  2. Интегрированный подход к разработке нефтяных оторочек Новопортовского нефтегазоконденсатного месторождения / СугаиповД.А., БаженовД.Ю., ДевятьяровС.С., УшмаевО.С., ПеревозкинИ.В., ФедоровМ.В.// Нефтяное хозяйство. – 2016. - №12.– С. 60–63.
    [Google Scholar]
  3. Опыт бурения многозабойных горизонтальных скважин для разработки нефтяных оторочек на примере Новопортовского месторождения/ СугаиповД.А., РустамовИ.Ф., УшмаевО.С., ОвечкинА.В., БаженовД.Ю., ПильникС.В., БурковФ.А.// Нефтяное хозяйство. – 2017. - №12. – С. 35–36.
    [Google Scholar]
  4. Успешный опыт строительства многозабойных скважин по технологии TAML 1 на Новопортовском месторождении/ ПильникС., ДубровинА., ЗимоглядМ., БулатовФ., БурковФ., АбалтусовН.//SPE191521-18RPTC-RU, 2018
    [Google Scholar]
  5. Technological challenges of oil rim development in terms of Novoportovskoe field/BadgutdinovR.R., ApasovR.T., FedorovM.V., UshmaevO.S., SitnikovA.S. (Gazpromneft NTC LLC, RF, Saint-Petersburg – Tyumen), BazhenovD.Yu., GarenskikhD.A. (Gazprom neftNovy Port LLC, RF, Tyumen) // NeftyanoeKhozyastvo. – 2015. - No12. – p. 56–59.
    [Google Scholar]
  6. Integrated approach to oil rim development in terms of Novoportovskoye field / SugaipovD.A.(Gazprom Neft PJSC, RF, Saint-Petersburg), BazhenovD.Yu., DevyatyarovS.S. (Gazpromneft- Yamal, RF, Saint-Petersburg – Tyumen), UshmaevO.S., PerevozkinI.V., FedorovM.V.(Gazpromneft NTC LLC, RF, Saint-Petersburg – Tyumen) // Neftyanoe Khozyastvo. – 2016. - No12.– p. 60–63.
    [Google Scholar]
  7. Results of multilateral drilling on Novoportovskoye field / SugaipovD.A., RustamovI.F.(Gazprom Neft PJSC, RF, Saint-Petersburg), UshmaevO.S. (Gazpromneft-Razvitie LLC, RF, Saint-Petersburg), OvechkinA.V., BazhenovD.Yu., PilnikS.V., BurkovF.A. (Gazpromneft-Yamal LLC, RF, Tyumen) // Neftyanoe Khozyastvo. – 2017. - No12. – p. 35–36.
    [Google Scholar]
  8. Proven Experience in Construction of Multilateral Wells Using TAML 1 Technology in Novoportovskoye Field / PilnikSergey (Gazpromneft-Yamal), DubrovinAndrey (Weatherford) , ZimoglyadMikhail (Gazpromneft-Yamal), BulatovFuat (Gazpromneft-Yamal), BurkovFedor(Gazpromneft-Yamal), AbaltusovNikolay (Weatherford)//SPE191521-18RPTC-RU, 2018
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201901862
Loading
/content/papers/10.3997/2214-4609.201901862
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error