1887

Abstract

Summary

The presented report discusses the survey results of the technical condition of the unfinished road tunnel construction on the site: “The public highway of regional importance of the Republic of Bashkortostan - a new exit from the city of Ufa to the federal highway M-5 Ural (Eastern exit).” The purpose of the work was to research the engineering-geological and hydro-geological conditions of tunnel to estimate rock mass stability. At the moment, the main problems in the process of developing the project for the reconstruction of the tunnel and the completion of its construction are:

  • - the presence of karst formations in the vicinity of the tunnel;
  • - water-saturated zones, not opened by existing galleries.

The exploration of these problems will be the basis for the decision on the need to build a drainage tunnel. It was these circumstances that required the use of the seismic method in a sophisticated observation system with the ultimate goal of constructing a 3D parametric data set that provides for the detection of karst formations and disintegration zones at hazardous distances from the tunnel axis.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201800550
2018-04-23
2024-04-26
Loading full text...

Full text loading...

References

  1. PisetskiV.B., VlasovV.V., CherepanovV.P., AbaturovaI.V., ZudilinA.E., PatrushevU.V., AlexandrovaA.V.
    Stability prediction of the rock mass on the basis of the method of seismic location in the process of construction of underground structures // EAGE, “Engineering geophysics 2014”, Gelendgik.-2014. “Engeneering research”. PNIIS. No 7. – 2014.-P. 46–51.
    [Google Scholar]
  2. PisetskiV.B., LapinE.S., AbaturovaI.V., ZudilinA.E.
    Evaluation of the structure and parameters of the stressed state of a rock mass in the construction of underground structures // Gorny Jurnal. 2014. № 9. P. 45–47.
    [Google Scholar]
  3. PisetskiV.B., LapinE.S., AlexandrovaA.V., LapinS.E.
    To the task of formulating general requirements and the practical implementation of a seismic monitoring and forecast system for sudden emissions and mountain impacts // Bezopasnost truda v promyshlennosti. № 12. – 2013. – P. 49–57
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201800550
Loading
/content/papers/10.3997/2214-4609.201800550
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error